30 Chapter 2 Table 1. RPM BPND obtained using shorter time intervals compared to plasma input DVR-1, SRTM BPND and RPM BPND obtained with the original scan duration. DVR-1 (0-60/80-130) SRTM BPND (0-60/80-130) RPM BPND (0-60/80-130) HC AD HC AD HC AD r2 Slope r2 Slope r2 Slope r2 Slope r2 Slope r2 Slope RPM BPND (0-60/80-120) 0.95 0.91 0.95 0.96 0.99 1.02 0.97 0.90 1.00 1.01 1.00 0.99 RPM BPND (0-60/80-110) 0.95 0.92 0.95 0.94 0.99 1.03 0.97 0.88 0.99 1.02 1.00 0.97 RPM BPND (0-60/80-100) 0.94 0.95 0.94 0.92 0.98 1.05 0.96 0.85 0.98 1.04 0.99 0.94 The correlation and slope for the original scan duration between RPM BPND and DVR-1 was r2= 0.95 slope= 0.91 for HC and, r2= 0.96 slope= 0.98 for AD. The correspondence between original RPM BPND and SRTM BPND was r2= 1.00 slope= 1.01 for HC and r2= 0.97 slope= 0.91 for AD.
RkJQdWJsaXNoZXIy MjY0ODMw